Live Chat WhatsApp Call Us
← Back to plan selection

Your details

We'll use this to schedule your site survey and process your subscription.

Required for credit assessment

For site survey scheduling

Installation address

The home where your aircon will be installed.

Payment method

A 2-month deposit is charged today. Monthly billing begins after your aircon is installed.

By confirming, you agree to a 2-month deposit charge today. Monthly billing starts after installation.

🔒 SSL Secured

✓ Cancel before install

Order summary

PRISM+ Neo · System 3

3 units · Matte White · 9K/9K/12K BTU

Plan term

60 months

Monthly fee

$135

Total over term

$8,100.00

DUE TODAY · 2-MONTH DEPOSIT

$270.00

Held as deposit. Refundable if site survey reveals home isn't suitable.

Then monthly from install

$135/month

Monthly billing starts 1 working day before the scheduled installation date. The deposit will be returned at the end of the subscription term.

  • PRISM+ Neo System 3 air-conditioning unit
  • Free standard installation (HDB / Condo)
  • Free site survey before install
  • 20 quarterly servicing visits over 5 years
  • Full warranty coverage for 60 months
  • 1 × Chemical Overhaul (5-year plan exclusive)

Free site survey before anything is installed

After this checkout, our team will reach out to arrange your site survey. You only confirm your final monthly amount after the survey.

You're all set, Haifa.

Thanks for choosing PRISM+. We've sent your order confirmation to haifa@example.com. Our team will be in touch within 1 working day to schedule your site survey.

Subscription Id

#CIR-2026-08742

Subscription Date

28 April 2026

Plan

60-month subscription

What happens next

Here's exactly what to expect over the next few days.

Just now

Order confirmed

Your subscription has been received and a 2-month deposit of $270 has been charged to your card ending in •• 4892.

2

Within 1 working day

Site survey call from PRISM+

Our team will reach out to arrange a free on-site assessment. We'll confirm BTU sizing, piping route, and your final monthly amount before any installation.

3

After site survey

Site survey at your home

A specialist visits your home, confirms what's needed, and walks you through any non-standard requirements.

4

Within 7-14 working days

Installation day

PRISM+ technicians install your Neo system, typically 9am to 5pm and the cooling starts right after.

Useful next steps

A few things you can do now to make installation day go smoothly.

Download PRISM+ Connect app

Set up your account ahead of install day.

Chat with us on WhatsApp

Got questions? We reply within the day.

Order details

A copy of this has been emailed to you. You can also download it as a PDF below.

PRISM+ Neo · System 3

3 units · Matte White · 9K / 9K / 12K BTU · CU28

Installation Address

Haifa H
Block 123 Tampines Street 45
#12-345, Singapore 521123

Contact

haifa@example.com
+65 9123 4567

For site survey scheduling

Plan term

60 months

Monthly fee

$135 / month

Total over term

$8,100.00

Charged today (2-month deposit)

$270.00

Next charge

$135.00 — starts on install date

Questions in the meantime? We're here.

Chat with us on WhatsApp for the fastest response, or call our team directly. Most questions about the site survey or installation are answered in our help centre.